How to Integrate Easypost with Daton
This subtopic provides step-by-step instructions to create Easypost integrations in Daton, detailing the prerequisites, the integration process, and important notes.
How to Integrate Easypost with Daton
This subtopic provides step-by-step instructions to create Easypost integrations in Daton, detailing the prerequisites, the integration process, and important notes.
Task 2: Integrate Easypost with Daton
- Sign in to Daton
- Select Easypost from the list of Integrations
- Provide Integration Name, Replication Frequency, and History. Integration name would be used in creating tables for the integration and cannot be changed later
- Provide Easypost Username. Follow the link learn more about Easypost Authentication.
- Post successful authentication, you will be prompted to choose from the list of available tables
- Then select all required fields for each table
- Submit the integration
Important Note
- Integrations would begin in the Pending state and change to the Active state once the first job successfully loaded data into the configured warehouse.
- Users can check job status and process logs from the integration details page by clicking on the integration name in the active list.
- Users can Re-Authenticate, Edit, Clone, Pause, or Delete the integration at any moment by clicking on settings. You can also adjust the frequency and history of the integration.
- On the Sources page, click Integration to access each table in your integration. The page also shows the state of each table, the last replicated time, and the Reload access buttons.